KLHdesigner co2

KLH Logo

LCA (Life cycle assessment A1-A3)

Calculation results (Production)

Life cycle breakdown

CO2 v2 lifecycle bar chart. Positive values extend right from zero; negative values extend left.Grid lines for x-axis values from -100 to 100One child group per chart row.CO2 Wood: -76.2 tIcon for CO2 Wood-76.2 tProduction (A1-A3): +7.7 tIcon for Production (A1-A3)+7.7 tCO2 project: -68.6 tIcon for CO2 project-68.6 tText labels for the x-axis orientation values-100-75-50-250255075100
CO2 v2 lifecycle bar chart. Bars use absolute lengths from zero; the original sign controls color, class, and value-label side.Grid lines for x-axis values from 0 to 100One child group per chart row.CO2 Wood: -76.2 tIcon for CO2 Wood-76.2 tProduction (A1-A3): +7.7 tIcon for Production (A1-A3)+7.7 tCO2 project: -68.6 tIcon for CO2 project-68.6 tText labels for the x-axis orientation values050100
Net life cycle impact
-68.6t CO2 eq.
CO2 Wood-76.2 t
A1-A37.7 t
CO2 stored in wood
-76.2t
Regrowth time in Austria
2minutes

Production and construction stage

DescriptionValueUnit
WoodCO2 Wood · t CO2 eq.
WoodCO2 Wood-76.2t CO2 eq.
A1-A3Production · t CO2 eq.
A1-A3Production7.7t CO2 eq.
A4Transport · t CO2 eq.
A4Transport-t CO2 eq.
A5Assembly · t CO2 eq.
A5Assembly-t CO2 eq.
TotalProduction and construction stage · t CO2 eq.
TotalProduction and construction stage-68.6t CO2 eq.

End of life stage

DescriptionValueUnit
C1Deconstruction · t CO2 eq.
C1Deconstruction-t CO2 eq.
C2Transport · t CO2 eq.
C2Transport-t CO2 eq.
C3Wasteprocessing · t CO2 eq.
C3Wasteprocessing-t CO2 eq.
DRe-use potential · t CO2 eq.
DRe-use potential-t CO2 eq.
Subtotal (C-D) · t CO2 eq.
Subtotal (C-D)-t CO2 eq.
Production and construction stage · t CO2 eq.
Production and construction stage-68.6t CO2 eq.
TotalNet total (incl. production) · t CO2 eq.
TotalNet total (incl. production)-t CO2 eq.
co2